By Stronglove 2011-01-17 11:16:48
I'm just saying I would like to see the SUM changed to SP Total, calculating the base SP needed to be at the current rank for each of the rank numbers shown for the character.
Rank TNR Total SP Gained
3 700 1270
4 880 2150
5 1100 3250
...
So, if somebody had attained only 5 in all 19 jobs, it would show the total as being Total Skill Point: 61750 or whatever in the SUM Column.
After all, R3->R4 is not the same as R45-R46... and showing `SUM` adds things up just like that. I think it would look a bit better in the end, even if not all jobs level up at the same rate...